Resource Vault UrsaNav NYSE Demonstration Presentation UrsaNav PTTI Conference Presentation eLoran System Definition and Signal Specification Tutorial eLoran as a PNT Resiliency Solution for ATM Applications “eLoran Points of Light” Q&A Paper Resilience Has a Name PPD-21 (Critical Infrastructure Security and Resiliency) – 2013 Royal Academy of Engineering Global Navigation Space Systems Reliance and Vulnerabilities – 2011 UK Government Office for Science Blackett Review – 2018 UK National Space Security Policy – 2014 VNTSC – Benefit-Cost of eLoran – 2009 VNTSC – Vulnerability Assessment of the Transportation Infrastructure Relying on GPS – 2001 London Economics – Economic impact to the UK of a disruption to GNSS – 2017 NASPI – Time Synchronization in the Electric Power System – 2017 DHS Adoption of eLoran – 2008 DHS NPPD – National Risk Estimate – 2011 DOT VNTSC NOAA – GPS Dependencies in the Transportation Sector – 2016 IDA IAT Report on eLoran – 2009 FAA – eLoran Final Report – 2004 DHS – National Risk Estimate GPS Disruptions – 2015 Leadership in Resilient PNT 29NOV2017